, being first duly sworn, hereby depose and say that the following matters are true and correct to the best of my knowledge and belief:ġ. The survey and platting criteria established by the division, before are the criteria for surveying land entered upon before that date, and in such cases the following surveyor's affidavit must be presented with the open-to-entry plat and the field notes: After approval, the final survey plat and the surveyor's affidavit must be filed for acceptance by the division. If the field inspection verifies that all field work has been completed in accordance with division survey criteria, as shown on the final plat and as attested to on the surveyor's affidavit, the director may approve the survey. If the survey is disapproved, a field inspection of the survey will be made within 90 days after disapproval. The director shall approve or disapprove the survey within 30 days after receiving the final survey plat and affidavit. (3) For an open-to-entry parcel that was not surveyed before entry, a final survey plat and a surveyor's affidavit, attesting that all field work has been completed in accordance with this chapter, must be filed with the director before the expiration of the lease. In addition, the final plat must show the lease number assigned by the division. If the applicant chooses an actual field survey, the line of mean high tide must be located as in (1) of this subsection. In the case of a conflict between a lease tract located by a paper plat and a lease tract located by an actual field survey, the field survey governs. A preliminary plat must be submitted with his application. The applicant has the choice of submitting either a paper plat or a plat that represents an actual field survey. (2) The applicant for a shore fishery development lease need not have an actual field survey. 120(1) of this chapter, and the final plat must show the course of the shoreline for an additional 400 feet from each side of the survey. (1) For a tideland survey, the line of mean high tide must be determined as in sec. (b) The following are additional requirements for metes and bounds surveys of tidelands, shore fishery development sites, and open-to-entry sites: Metes and bounds surveys are used for tideland surveys, shore fishery development surveys, open-to-entry surveys, homesite surveys, public and private recreation site surveys, and certain municipal land selection surveys. Both of these monuments must have a latitude and longitude established to an accuracy in keeping with the class of survey, with the latitude and longitude of one of them being called out in the property description. The description must begin at a monumented corner position and have an origin of bearing and distance call to an officially recognized monument that has a known relationship to the rectangular survey system. A "metes and bounds" property description must be shown on the plat. For all metes and bounds surveys, both a preliminary plat and a final plat must be prepared in accordance with secs. Survey or platting criteria unique to a particular type of survey will be set forth in special survey instructions issued by the division. (a) Metes and bounds surveys must be surveyed to Class III standards, except that the division may authorize surveys to Class IV standards in certain instances.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |